TYRE BLADDER

Tyre building bladder/ Tyre curing bladder

General Information of Vulcanization
  • Vulcanization is the process of applying pressure to the green tire in a mold in order to give it its final shape, and applying heat energy to stimulate the chemical reaction between the rubber compounds and other materials.

    In this process the green tire is automatically transferred onto the lower mold bead seat, a rubber bladder is inserted into the green tire, and the mold closes while the bladder inflates. As the mold closes and is locked the bladder pressure increases so as to make the green tire flow into the mold, taking on the tread pattern and sidewall lettering engraved into the mold. The bladder is filled with a recirculating heat transfer medium, such as steam, hot water, or inert gas. At the end of cure the pressure is bled down, the mold opened, and the tire stripped out of the mold.

Select Product
TYRE CURING BLADDER

INSTRUCTIONS

The tyre curing bladder (hereinafter referred to as curing bladder) is an essential tool in vulcanization of tyre. The quality of the curing bladder is closely related not only to the production cost but also to the quality of tyre. In order to extend the curing bladder service life and avoid unnecessary losses, please refer to instructions carefully.

Pre-storage Inspection
  • 1

    Please check whether the package is complete and the curing bladder size is clearly identified before storage.

  • Please inspect the curing bladder according to the “Tyre Curing Bladder Standard”(Q/JTD001 -2003) we have provided or according to the contract requirement.

    2
  • Each curing bladder is attached with a Tyre Curing Bladder Performance Record Form in each bag or each case.

    3
  • If you find the goods do not meet your requirements, please keep them as they are and contact us immediately so that we can provide faster and better service for you.

    4
  • Storage
    Conditions

  • In order to avoid possible deformation during long-time storage, the height for bagged curing bladders must not exceed 6 layers or 2500mm.    

    1
  • Store the curing bladders under room temperature ( dark and dry place) , keep them away from chemicals,heat sources and ozone sources, prevent them from sunlight, and what’s more, curing bladders must be kept away from any oil.

    2
  • It is better not to open the case 48 hours before use, in case the storage conditions are in conflict with the above article 6.

    3
  • The OTR curing bladder must be resumed to its original shape before being put in storage.

    4
  • Please take care to prevent curing bladders from any sharp objects to avoid any possible hard damages under storage and transportation conditions.            

    5
Recommendations for Achieving Best Bladder Perform

FENGFU Bladders are manufactured using a well proven long-lasting heat conductive butyl rubber compound.
The high degree of elasticity of the bladder guarantees trouble-free molding and stripping. 

Recommendations

  • We suggest that you store the curing bladder at least 90 days from the date of production before use.
  • Please resume the curing bladder to its original shape 24 hours prior to use.
  • Before mounting curing bladders, please check whether the curing bladder size match as the tyre size. We suggest you choosing the proper clamping size as per curing bladder clamping parameters.
  • Before mounting bladders into curing press we recommend to pre-treat the bladders with a bladder coating material to optimize your curing bladder performance and extend the curing bladder life time.
  • Spraying of isolation agent inside the green tyre is necessary in order to avoid sticking, trapped air or stripping problems 
  • We suggest you do not use any lubricants during clamping the curing bladders, please pay attention not to use any diluted water-solubility silicon latex and not to drop it on the tyre mould surface.
  • When you test the curing bladder air tightness, the elongation of curing bladders should be proper in order to avoid destroying the curing bladder or causing other problems.
  • The strict deoxidization of overheated water and nitrogen vulcanization can evidently extend the curing bladder service life.
  • Before tire curing starts, the bladder should be fully warmed up. For this, the machine should be operated according to the press manual.
  • In case of pre-inflating during the warm up, the bladder outside diameter must not exceed the tire sidewall plate outside diameter of the tire mold, in order to avoid non-symmetric deformation.
  • If the bladder has cooled down after an interruption in the curing process, it is imperative to warm it up again.
  • Please fill in the Curing Bladder Performance Record Form seriously, in order to get better service when curing bladders quality problem come out .

We will get you the fastest free quote, arrange the free samples for your testing and accept customization.

subscription